References

HV-Switch for Sand extraction installation

Gebhard has delivered a high-voltage switch for Dekker Groep. With a team of HV specialists, this assignment was perfect for us.

Support in achieving their goals

Their goal is to achieve a CO2-reduction of 80% in a maximum of 7 years. They want to accomplish this by electrifying their equipment, for example. Dekker Group’s Emmy-Yvonne’s sand extraction installation now runs completely electrical. Gebhard Electro’s high-voltage technicians installed and tested the high-voltage switch and termination for the electrical installation of the sand extraction installation Emmy-Yvonne.

Our client

Scope of supply

Questions about this reference?

Bjorn van bommel

bvb@gebhard.nl
+31 (0)162 550511

Related references

  • 10-Year Survey Wandelaar

    DAB Vloot, shipowner of the Flemish government and part of the agency for maritime and coastal services, awarded Gebhard Electro the contract for …
  • Coastal Crown

    On behalf of the Bijlsma Wartena shipyard, Piet Brouwer Elektrotechniek and Gebhard Electro provided the latest Acta Marine flagship with a complete …