HV-Switch for Sand extraction installation

Gebhard has delivered a high-voltage switch for Dekker Groep. With a team of HV specialists, this assignment was perfect for us.

Support in achieving their goals

Their goal is to achieve a CO2-reduction of 80% in a maximum of 7 years. They want to accomplish this by electrifying their equipment, for example. Dekker Group’s Emmy-Yvonne’s sand extraction installation now runs completely electrical. Gebhard Electro’s high-voltage technicians installed and tested the high-voltage switch and termination for the electrical installation of the sand extraction installation Emmy-Yvonne.

Our client

Scope of supply

Questions about this reference?

Bjorn van bommel

bvb@gebhard.nl
+31 (0)162 550511

Related references

Fully electric mining CSDs with integrated HV and LV power systems, designed for reliable zero-emission dredging.
Gebhard Electro and Eekels Technology have received the order for a Main Switchboard Modification of the RollDock Sun. During this project, Gebhard Electro and Eekels Technology work closely together to achieve the best result in a short time.