HV-Switch for Sand extraction installation

Gebhard has delivered a high-voltage switch for Dekker Groep. With a team of HV specialists, this assignment was perfect for us.

Support in achieving their goals

Their goal is to achieve a CO2-reduction of 80% in a maximum of 7 years. They want to accomplish this by electrifying their equipment, for example. Dekker Group’s Emmy-Yvonne’s sand extraction installation now runs completely electrical. Gebhard Electro’s high-voltage technicians installed and tested the high-voltage switch and termination for the electrical installation of the sand extraction installation Emmy-Yvonne.

Our client

Scope of supply

Questions about this reference?

conset sadipscing

Ship expert
info@gebhard.nl
+31(0)162-452888

Related references

  • Damen ECSD650

    Damen Dredging Equipment has awarded Gebhard Electro the contract to develop the drive system for Damen’s first fully electric Cutter Suction …
  • Rolldock Sun

    Gebhard Electro and Eekels Technology have received the order for a Main Switchboard Modification of the RollDock Sun. During this project, Gebhard …